Our client wished to replace an old and unreliable water deionisation system at its boiler corrosion test facility with a modern, low maintenance solution. This system needed to meet the demands of both boiler testing – which intermittently requires several hundred litres of water at a time – and the client’s on-site analytical chemistry laboratory, which has much lower, but relatively consistent, high purity water needs.
Veolia’s experts installed a CENTRA™ R200 system which combined water purification, storage and distribution into a single unit.
Download the full case study to see the result