Client Needs

INEOS ChlorVinyls’ wooden cooling towers were to be replaced but shutting down the cooling system would result in lost production, so the towers were to be replaced one at a time. In order to complete the on-line change 50m3/hr of cooling water, contaminated with demolition debris, flowing into the sump of the off-line tower had to be handled and treated.

Our Solution

Veolia Water Technologies’s solution was to provide an Mobile Water Services temporary plant consisting of pumps and two stages of filtration: coarse strainers followed by bag filters.

The Result

• Prevented discharge of contaminated water •Conserved water in cooling system •Cost saving around £30k