A biopharma company was building a new laboratory and investigated decommissioning, relocating and recommissioning an existing water treatment plant located in an adjacent building.
Our Scientific Sales Manager argued that a new water treatment system offering a higher makeup rate, smaller storage capacity and a higher flow rate would be a more efficient solution than that which would be offered by the existing system. We recommended modifying our standard CENTRA™R200 HFV unit to provide a higher make-up rate, which optimised the way that large volumes of pure water are produced, stored and distributed - as one self-contained integrated solution.
Download our case study to read the full results.